Jump to content

Translations:Munter hitch/14/en: Difference between revisions

From Climbopedia
FuzzyBot (talk | contribs)
Importing a new version from external source
 
FuzzyBot (talk | contribs)
Importing a new version from external source
 
Line 1: Line 1:
=== Tying for a harness belay ===
=== Tying for a harness belay ===
[[File: Hms_harness_step0.png|120px]]
{{#invoke:FlexGallery|gallery
[[File: Hms_harness_step1.png|120px]]
|120px
[[File: Hms_harness_step2.png|120px]]
|File: Hms_harness_step0.png
[[File: Hms_harness_step3.png|120px]]
|Start with a rope through the carabiner which is attached to your harness
[[File: Hms_harness_step4.png|120px]]
|File: Hms_harness_step1.png
[[File: Hms_harness_step5.png|120px]]
|Take a bight of the rope (1)
|File: Hms_harness_step2.png
|Make a loop (2)
|File: Hms_harness_step3.png
|Open the carabiner gate (3) and seat the loop into the carabiner (4)
|File: Hms_harness_step4.png
|Screw the safety-lock (5)
|File: Hms_harness_step5.png
|Inspect that everything is correct (6) and pull the break-strand (7) to test if the munter hitch flips into another munter
}}

Latest revision as of 07:59, 25 September 2025

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Munter hitch)
=== Tying for a harness belay ===
{{#invoke:FlexGallery|gallery
|120px
|File: Hms_harness_step0.png
|Start with a rope through the carabiner which is attached to your harness
|File: Hms_harness_step1.png
|Take a bight of the rope (1)
|File: Hms_harness_step2.png
|Make a loop (2)
|File: Hms_harness_step3.png
|Open the carabiner gate (3) and seat the loop into the carabiner (4)
|File: Hms_harness_step4.png
|Screw the safety-lock (5)
|File: Hms_harness_step5.png
|Inspect that everything is correct (6) and pull the break-strand (7) to test if the munter hitch flips into another munter
}}

Tying for a harness belay

  • Start with a rope through the carabiner which is attached to your harness
  • Take a bight of the rope (1)
  • Make a loop (2)
  • Open the carabiner gate (3) and seat the loop into the carabiner (4)
  • Screw the safety-lock (5)
  • Inspect that everything is correct (6) and pull the break-strand (7) to test if the munter hitch flips into another munter