Translations:Munter hitch/21/en: Difference between revisions
Importing a new version from external source |
Importing a new version from external source |
||
| Line 1: | Line 1: | ||
{{#invoke:FlexGallery|gallery_with_widths | |||
|File: hms_tieoff_step1_p6w.png | |||
|120px | |||
|If the knot is not in the correct position, flip the knot by giving a bit of a slack (1) | |||
|File: hms_tieoff_step2_p8w.png | |||
|160px | |||
|Make a loop (2) | |||
|File: hms_tieoff_step3_p8w.png | |||
|160px | |||
|Move it behind the sharp end of the rope (3) | |||
|File: hms_tieoff_step4_p8w.png | |||
|160px | |||
|Pull a bight of the rope belay end through the loop (4), making a slipknot around the sharp end | |||
|File: Munter_tieoff_step5.png | |||
|200px | |||
|Grab the bight with a hand (5) and simultaneously take slack out of the system while releasing the other hand (6), note that the break strand is still always being held during this step | |||
|File: hms_tieoff_step7_p8w.png | |||
|160px | |||
|Pull the bight through the carabiner (7), increase its size if necessary for the next steps | |||
|File: hms_tieoff_step8_p8w.png | |||
|160px | |||
|Secure the tie-off... | |||
|File: hms_tieoff_step9_p6w.png | |||
|120px | |||
|... by making an overhand around the life end of the rope (8,9) | |||
|File: hms_tieoff_step10_p6w.png | |||
|120px | |||
|And the mule-overhand tie-off is done | |||
}} | |||