Lowering a lead climber from an anchor: Difference between revisions
Unifited the guideline - made one detailed guideline which is separated into sections |
flow/clarity improvement |
||
| Line 27: | Line 27: | ||
|File:prebuilt_lowering_step4.png | |File:prebuilt_lowering_step4.png | ||
|200px | |200px | ||
|Inspect that the | |Inspect that both the belay loop and the Figure 8 you tied are clipped into the safebiner and that the Figure 8 properly is tied (4) | ||
|Eye inspecting proper binding into the rope by a safebiner with Figure 8 | |Eye inspecting proper binding into the rope by a safebiner with Figure 8 | ||
|File:prebuilt_lowering_step5.png | |File:prebuilt_lowering_step5.png | ||