Munter hitch: Difference between revisions
m Added numbers to the easy method description |
Tying for a harness belay - rewrote to the FlexGallery format |
||
| Line 39: | Line 39: | ||
<!--T:14--> | <!--T:14--> | ||
=== Tying for a harness belay === | === Tying for a harness belay === | ||
{{#invoke:FlexGallery|gallery | |||
|120px | |||
|File: Hms_harness_step0.png | |||
|Start with a rope through the carabiner which is attached to your harness | |||
|File: Hms_harness_step1.png | |||
|Take a bight of the rope (1) | |||
|File: Hms_harness_step2.png | |||
|Create a loop (2) | |||
|File: Hms_harness_step3.png | |||
|Open the carabiner gate (3) and seat the loop into the carabiner (4) | |||
|File: Hms_harness_step4.png | |||
|Screw the safety-lock (5) | |||
|File: Hms_harness_step5.png | |||
|Inspect that everything is correct (6) and pull the break-strand (7) to test if the munter hitch flips into another munter as a final check | |||
}} | |||
<!--T:16--> | <!--T:16--> | ||