Lowering a lead climber from an anchor: Difference between revisions
Detailed description links fixed |
m typo fixes |
||
| Line 6: | Line 6: | ||
* Freeing the rope end without loosing the rope (temporary tie-in) | * Freeing the rope end without loosing the rope (temporary tie-in) | ||
* Threading the rope through the anchor and retying to its end | * Threading the rope through the anchor and retying to its end | ||
* Removing the temporary tie-in, safety | * Removing the temporary tie-in, safety checks, cleaning up | ||
| Line 50: | Line 50: | ||
Steps: | Steps: | ||
* Pulling a bite of the rope through the anchor, and tying into it | * Pulling a bite of the rope through the anchor, and tying into it | ||
* Safety | * Safety checks, freeing the rope end, cleaning-up | ||
==== Pulling a bite of the rope through the anchor, and tying into it ==== | ==== Pulling a bite of the rope through the anchor, and tying into it ==== | ||
| Line 148: | Line 148: | ||
}} | }} | ||
===== Removing the temporary tie-in, safety | ===== Removing the temporary tie-in, safety checks, cleaning up ===== | ||
{{#invoke:FlexGallery|gallery_with_widths | {{#invoke:FlexGallery|gallery_with_widths | ||
|File:prebuilt_lowering_detailed_step9.png | |File:prebuilt_lowering_detailed_step9.png | ||