Lowering a lead climber from an anchor: Difference between revisions

Detailed description links fixed
m typo fixes
Line 6: Line 6:
* Freeing the rope end without loosing the rope (temporary tie-in)
* Freeing the rope end without loosing the rope (temporary tie-in)
* Threading the rope through the anchor and retying to its end
* Threading the rope through the anchor and retying to its end
* Removing the temporary tie-in, safety check, cleaning up
* Removing the temporary tie-in, safety checks, cleaning up




Line 50: Line 50:
Steps:
Steps:
* Pulling a bite of the rope through the anchor, and tying into it
* Pulling a bite of the rope through the anchor, and tying into it
* Safety check, freeing the rope end, cleaning-up
* Safety checks, freeing the rope end, cleaning-up


==== Pulling a bite of the rope through the anchor, and tying into it ====
==== Pulling a bite of the rope through the anchor, and tying into it ====
Line 148: Line 148:
}}
}}


===== Removing the temporary tie-in, safety check, cleaning up =====
===== Removing the temporary tie-in, safety checks, cleaning up =====
{{#invoke:FlexGallery|gallery_with_widths
{{#invoke:FlexGallery|gallery_with_widths
|File:prebuilt_lowering_detailed_step9.png
|File:prebuilt_lowering_detailed_step9.png