Lowering a lead climber from an anchor: Difference between revisions

Unifited the guideline - made one detailed guideline which is separated into sections
flow/clarity improvement
Line 27: Line 27:
|File:prebuilt_lowering_step4.png
|File:prebuilt_lowering_step4.png
|200px
|200px
|Inspect that the carabiner is in your belay loop and that the Figure 8 is tied properly and clipped in the carabiner (4)
|Inspect that both the belay loop and the Figure 8 you tied are clipped into the safebiner and that the Figure 8 properly is tied (4)
|Eye inspecting proper binding into the rope by a safebiner with Figure 8
|Eye inspecting proper binding into the rope by a safebiner with Figure 8
|File:prebuilt_lowering_step5.png
|File:prebuilt_lowering_step5.png