Main Page: Difference between revisions
m added the lowering split into the TOC |
|||
| Line 74: | Line 74: | ||
=== Latest Changes === | === Latest Changes === | ||
'''2025-11-15''' - [[Lowering a lead climber from an anchor]] - Redrawing done. Debugging of the design for desktop + search bar. Working on backups. | |||
'''2025-11-11''' - [[Lowering a lead climber from an anchor]] - split into two pages (separated the [[Lowering_from_a_pre-built_sport_anchor_-_quick_method|quick method]], reworked the core description, used safebiner for attaching to the rope. Methods for maillons and bolts are yet to be redrawn. | '''2025-11-11''' - [[Lowering a lead climber from an anchor]] - split into two pages (separated the [[Lowering_from_a_pre-built_sport_anchor_-_quick_method|quick method]], reworked the core description, used safebiner for attaching to the rope. Methods for maillons and bolts are yet to be redrawn. | ||
| Line 83: | Line 85: | ||
'''2025-10-04''' - [[Rope support with tuber]] - operation, dismantling and efficiency note added | '''2025-10-04''' - [[Rope support with tuber]] - operation, dismantling and efficiency note added | ||
=== Disclaimers === | === Disclaimers === | ||