Figure eight: Difference between revisions
| Line 15: | Line 15: | ||
== Tying == | == Tying == | ||
=== Follow-through (tie-in) === | === Follow-through (tie-in on the rope end) === | ||
This method is the most commonly used method for tying-in onto a rope end. | This method is the most commonly used method for tying-in onto a rope end. | ||