Rope support with tuber: Difference between revisions

Added the ATC rope support building
 
Line 20: Line 20:
|After the tie-off you can let go (2)
|After the tie-off you can let go (2)
|File:rope_support_atc_step4.png
|File:rope_support_atc_step4.png
|Mount the prusik onto the life strand (3) and quickdraw in case you want to redirect the pull downwards (optional, 4)
|[[Prusik_knot#Tying | Tie a prusik]] onto the life strand (3) and place a quickdraw in case you want to redirect the pull downwards (optional, 4)
|File:rope_support_atc_step5.png
|File:rope_support_atc_step5.png
|Pull the rope through the carabiner(s) (5)
|Pull the rope through the carabiner(s) (5)