Jump to content

Lowering a lead climber from an anchor: Difference between revisions

From Climbopedia
created more brief description, moved detailed description later into the page
Line 10: Line 10:
|File:prebuilt_lowering_brief_step2.png
|File:prebuilt_lowering_brief_step2.png
|90px
|90px
|Untie the Figure 8 which is directly at your harness
|Untie the Figure&nbsp8 which is directly at your harness
|File:prebuilt_lowering_brief_step3.png
|File:prebuilt_lowering_brief_step3.png
|180px
|180px

Revision as of 10:17, 12 October 2025

This method is used for removing gear from a sport anchor, with a subsequent lowering of the lead climber. An alternative is to abseil from an anchor. For routes with no fixed protection at the anchor point (trad), you have either to leave some gear behind, or where it is appropriate and reasonably safe, use for example abseil with an equivocation hitch.

Lowering from a pre-built sport anchor

step-by-step description

Lowering from a pre-built sport anchor - quick method

TODO

Lowering from bolts with maillons

TODO

Lowering directly from bolts or fixed ring

This method is forbidden by climbing associations in some countries and places. The ban is due to an increased bolts and fixed rings abrasion which leads to unnecessary and undesired shortening of the material replacement cycles. For example at traditional sandstone routes which are (due to a tradition) almost exclusively equipped with fixed rings, it would mean additional drilling into a rock which is often protected by a law due to nature preservation for further generations. In addition, this method cannot be used for lowering directly from hanger plates as the friction over the plates edges would severely damage the rope.

Step by step detailed descriptions

Lowering from a pre-built sport anchor - detailed description

References