Jump to content

Translations:Munter hitch/14/en

From Climbopedia
Revision as of 07:59, 25 September 2025 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Tying for a harness belay

  • Start with a rope through the carabiner which is attached to your harness
  • Take a bight of the rope (1)
  • Make a loop (2)
  • Open the carabiner gate (3) and seat the loop into the carabiner (4)
  • Screw the safety-lock (5)
  • Inspect that everything is correct (6) and pull the break-strand (7) to test if the munter hitch flips into another munter