Jump to content

Lowering a lead climber from an anchor

From Climbopedia
Revision as of 09:00, 12 October 2025 by Karl (talk | contribs) (step-by-step description: - minor flow refinement)

This method is used for removing gear from a sport anchor, with a subsequent lowering of the lead climber. An alternative is to abseil from an anchor. For routes with no fixed protection at the anchor point (trad), you have either to leave some gear behind, or where it is appropriate and reasonably safe, use for example abseil with an equivocation hitch.

Lowering from a pre-built sport anchor

step-by-step description

Lowering from a pre-built sport anchor - quick method

TODO

Lowering from bolts with maillons

TODO

Lowering directly from bolts or fixed ring

This method is forbidden by climbing associations in some countries and places. The ban is due to an increased bolts and fixed rings abrasion which leads to unnecessary and undesired shortening of the material replacement cycles. For example at traditional sandstone routes which are (due to a tradition) almost exclusively equipped with fixed rings, it would mean additional drilling into a rock which is often protected by a law due to nature preservation for further generations. In addition, this method cannot be used for lowering directly from hanger plates as the friction over the plates edges would severely damage the rope.